News & Event
-
Precautions For PVC Pipe Construction
1.PVC pipe placement: Before laying the PVC pipe, the pipe trench should be cleaned. If there are unevenness at the bottom of the trench, it must also be repaired first. If the trench bottom is still a gravel layer, sand should be filled with a thick...
Dec. 28. 2023
-
Main Features of GREMAX’S PIPE
1. Strong corrosion resistance: compared with general cast iron pipe and galvanized pipe, PVC pipe has strong corrosion resistance, strong acid and alkali, and will not rust and scale. Do not worry about the phenomenon of "red water" when ...
Dec. 28. 2023
-
Key Precautions For Storage And Construction Of UPVC Pipe And Valve Components
1.During the unloading and installation process, it is strictly prohibited to drop, throw, throw or smash goods.2.The inventory location should be indoors or in a cool place, away from heat sources or dangerous goods; It is strictly prohibited to m...
Dec. 28. 2023
EN
AR
BG
HR
CS
DA
NL
FR
DE
EL
HI
IT
JA
KO
PL
PT
RO
RU
ES
SV
CA
TL
IW
ID
LV
SR
SK
SL
UK
VI
SQ
HU
MT
TH
TR
MS
BE
KA
PA
XH
